18/00338/FULM Blueprint Commercial Centre Imperial Way

Demolition of existing B1 (Business) and B2 (General industrial) buildings and erection of replacement development comprising two new B1 (b) (Research and Development) and (c) (Industrial Process), B2 (General Industrial) and B8 (Storage and Distribution) buildings with re-positioned access, parking and turning facilities.

Minutes:

The committee received the report of the Head of Development Management, including the relevant planning history of the site and details of the responses to the application. 

 

The Principal Planning Officer introduced the report explaining that the application proposed the demolition of the existing buildings and erection of a replacement development with re-positioned access, parking and turning facilities.

 

The Chair invited Mike Barber, the agent, to speak for the application.  Mr Barber explained that the existing buildings had reached the end of their serviceable life; it was proving increasingly difficult to extend tenancy arrangements.  The applicant had worked closely with officers to devise modern employment floor space with improved access and parking arrangements within the site. 

 

The Chair invited comments from the committee. 

 

Committee members welcomed the application which would promote employment opportunities in the borough.  It was suggested that planning permission should include an additional condition requiring electric charging points to be included in the development.  These might be passive points to enable electric charging to be introduced at a later date.

 

The Chair moved the officer’s recommendation, subject to the inclusion of an additional condition on electric charging points.

 

RESOLVED –

 

that planning permission be granted subject to the following conditions:

 

1.         The development to which this permission relates shall be begun within a period of three years commencing on the date of this permission.

 

2.         Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), and any subsequent legislation that amends or supersedes this Order, the floorspace hereby approved shall only be used for purposes within Classes B1(b), B1(c), B2 and B8 of the Town and Country Planning (Use Classes) Order 1987 (as amended) as shown on the approved plans, unless otherwise agreed in writing by the Local Planning Authority.

 

3.         All the external surfaces of the development shall be finished in the materials shown on the approved plans. Details of any alternative materials shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development and the development shall only be carried out in accordance with any alternative details approved by this condition.

 

4.         The development hereby approved shall not be occupied until the new vehicular access and on-site car parking spaces and manoeuvring areas have been constructed and laid out in accordance with drawing No. 2617/P6 Rev A (or any subsequent drawing submitted to and approved in writing by the Local Planning Authority). The vehicular access and on-site car parking spaces and manoeuvring areas shall be retained at all times thereafter unless otherwise agreed in writing by the Local Planning Authority.

 

5.         The development hereby approved shall not be occupied until the existing vehicular access from Imperial Way has been stopped up by raising the existing dropped kerb and reinstating the footway and highway boundary to the same line, levels and detail as the adjoining footway, verge and highway boundary.

 

6.         The development permitted by this planning permission shall be carried out in accordance with the approved surface water drainage assessment carried out by Surface Water Drainage Strategy & Sustainable Drainage Management and Maintenance Plan prepared by Monson Engineering job number 8675V, issue B, dated 3rd August 2018:

 

1.         Limiting the surface water run-off generated by the critical storm events so that it will not exceed the surface water run-off during the 1 in 100 year event plus 40% of climate change event.

 

2.         Providing storage to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year plus 40% for climate change event providing storage volume in permeable paving and underground aquacell feature.

 

3.         Discharge of surface water from the private network into the ground.

 

            The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.

 

7.         No above ground construction may commence until a detailed surface water drainage scheme for the site based on the approved drainage strategy and sustainable drainage principles, has been submitted to and approved in writing by the local planning authority. The drainage strategy should demonstrate the surface water run-off generated up to and including 1 in 100 year + climate change critical storm will not exceed the run-off from the undeveloped site following the corresponding rainfall event. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed.

 

1.         Detailed engineered drawings of the proposed SuDS features including cross section drawings, their size, volume, depth and any inlet and outlet features including any connecting pipe runs.

2.         Final detailed management plan to include arrangements for adoption and any other arrangements to secure the operation of the scheme throughout its lifetime.

 

8.         The development hereby approved shall not be occupied until refuse, recycling and cycle storage has been provided in accordance with the approved plans. The storage facilities shall be retained at all times thereafter.

 

9.         No development approved by this planning permission (excluding demolition works down to slab level to facilitate further intrusive site investigation), shall commence until a remediation strategy to deal with the risks associated with contamination of the site has been submitted to, and approved in writing by, the Local Planning Authority. This strategy will include the following components:

 

1.         A preliminary risk assessment which has identified:

·        all previous uses;

·        potential contaminants associated with those uses;

·        a conceptual model of the site indicating sources, pathways and receptors; and

·        potentially unacceptable risks arising from contamination at the site.

 

2.         A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.

 

3.         The results of the site investigation and the detailed risk assessment referred to in (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

 

4.         A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.

 

            Any changes to these components require the written consent of the local planning authority. The scheme shall be implemented as approved.

 

10.       Prior to any part of the development hereby approved being brought into use a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved in writing by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met.

 

11.       No development shall commence until a monitoring and maintenance plan in respect of contamination, including a timetable of monitoring and submission of reports to the Local Planning Authority, has been submitted to, and approved in writing by, the Local Planning Authority. Reports as specified in the approved plan, including details of any necessary contingency action arising from the monitoring, shall be submitted to, and approved in writing by, the Local Planning Authority.

 

12.       If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until a remediation strategy detailing how this contamination will be dealt with has been submitted to and approved in writing by the Local Planning Authority. The remediation strategy shall be implemented as approved.

 

13.       No infiltration of surface water drainage into the ground at the site shall take place other than with the express written consent of the Local Planning Authority, which may be given for those parts of the site where it has been demonstrated that there is no resultant unacceptable risk to controlled waters. The development shall be carried out in accordance with the approved details.

 

14.       No piling or any other foundation designs using penetrative methods shall be carried out until a piling method statement (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) has been submitted to and approved in writing by the Local Planning Authority. The piling method statement must also demonstrate that there will be no resultant unacceptable risk to groundwater. Any piling must be undertaken in accordance with the approved piling method statement.

 

15.       The building hereby approved shall not be occupied until a scheme for managing any borehole installed for the investigation of soils, groundwater or geotechnical purposes has been submitted to and approved in writing by the local planning authority. The scheme shall provide details of how redundant boreholes are to be decommissioned and how any boreholes that need to be retained, post-development, for monitoring purposes will be secured, protected and inspected. The scheme as approved shall be implemented prior to the occupation of the building.

 

16.       The development shall be carried out in accordance with the following drawings, unless otherwise approved in writing by the Local Planning Authority. The following drawings are hereby approved: 2617/P1; 2617/P2; 2617/P4; 2617/P5; 2617/P6 Rev A; 2617/P7; 2617/P8; 2617/P9; 2617/P10; 2617/P11; 2617/P12; and 2617/P13.

 

17.      No above ground construction may commence until a scheme for active and passive electric charging points for on-site vehicles has been submitted to and approved in writing by the Local Planning Authority.  The electric charging infrastructure and charging points shall be installed in accordance with the approved scheme prior to the first occupation of the development.

 

Informatives

 

1.         In dealing with this application, Watford Borough Council has considered the proposal in a positive and proactive manner having regard to the policies of the development plan as well as paragraphs 186 and 187 of the National Planning Policy Framework and other material considerations, and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2010, as amended.   

 

2.         This permission does not remove the need to obtain any separate consent, which may be required under the Buildings Act 1984 or other building control legislation. Nor does it override any private rights which any person may have relating to the land affected by this decision. 

 

            To find out more information and for advice as to whether a Building Regulations application will be required please visit www.watfordbuildingcontrol.com.

 

3.         This planning permission does not remove the need to obtain any separate consent of the owner of the adjoining property prior to commencing building works on, under, above or immediately adjacent to their property (e.g. foundations or guttering). The Party Wall Etc Act 1996 contains requirements to serve notice on adjoining owners of property under certain circumstances, and a procedure exists for resolving disputes.  This is a matter of civil law between the two parties, and the Local Planning Authority are not involved in such matters.  A free guide called "The Party Wall Etc Act 1996: Explanatory Booklet" is available on the website of the Department for Communities and Local Government at https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/393927/Party_Wall_etc__Act_1996_-_Explanatory_Booklet.pdf

 

4.         You are advised of the need to comply with the provisions of The Control of Pollution Act 1974, The Health and Safety at Work Act 1974, The Clean Air Act 1993 and The Environmental Protection Act 1990.

 

            In order to minimise impact of noise, any works associated with the development which are audible at the site boundary should be restricted to the following hours:

 

Monday to Friday 8am to 6pm

Saturdays 8am to 1pm

Noisy work is prohibited on Sundays and bank holidays

 

            Instructions should be given to ensure that vehicles and plant entering and leaving the site comply with the stated hours of work.

 

            Further details for both the applicant and those potentially affected by construction noise can be found on the Council's website at: https://www.watford.gov.uk/info/20010/your_environment/188/neighbour_complaints_%E2%80%93_construction_noise

 

5.         Construction standards for new/amended vehicle access: Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission, requirements and for the work to be carried out on the applicant’s behalf. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/changes-to-your-road/dropped-kerbs/dropped-kerbs.aspx or by telephoning 0300 1234047.

 

6.         The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspxor by telephoning 0300 1234047.

 

7.         Obstruction of public highway land: It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/business-licences.aspx or by telephoning 0300 1234047.

 

8.         It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/highways-roads-and-pavements.aspx or by telephoning 0300 1234047.

 

9.         The planning officer's full report gives more detail than is to be found in the Decision Notice.  The full report can be obtained from the Council's website www.watford.gov.uk/planning or on request from the Regeneration and Development Department.