Agenda item

Agenda item

21/00159/VARM Integrity House 3 Rhodes Way Watford WD24 4YW

Minutes:

The committee received the report of the Principal Planning Officer (AR).

 

                   The Chair then asked the committee for any comments or questions.  There being none, he put the vote to the committee to approve the officer’s recommendation to approve the application that planning permission be granted, subject to the conditions listed in the report. 

 

                   In accordance with Standing Committee Procedure Rules, paragraph 4.2, the Chair requested that it be recorded in the minutes how members cast their votes.

 

                   Those members voting for the motion:

Councillors Bell, Collett, Jeffree, Johnson, Mills, Pattinson, Sharpe, Smith and Watkin

 

                   Those members voting against the motion:

None.

 

                   Those members abstaining:

None.

                   RESOLVED -

That planning permission be granted subject to the conditions listed below:

 

Conditions

 

1.  The development to which this permission relates shall be begun before 3rd September 2023.

 

2.                The development shall be carried out in accordance with the following drawings, unless otherwise approved in writing by the Local Planning Authority. The following drawings are hereby approved:

 

18019-TP-001

18019-TP-002

18019-TP-003

18019-TP-004

18019-TP-005 Rev C

18019-TP-006 Rev B

18019-TP-007 Rev B

18019-TP-008 Rev C

18019-TP-009 Rev A

18019-TP-010 Rev B

18019-TP-011 Rev B

18019-TP-012 Rev B

18019-TP-013 Rev B

18019-TP-014 Rev B

18019-TP-015 Rev B

18019-TP-016

18019- Materials finishes Rev A

18019-SK-025 Rev B

 

3.                The external surfaces of the development shall be finished in the materials as specified on approved drawings and in document ‘18019- Materials finishes Rev A’ unless otherwise agreed in writing by the Local Planning Authority.

 

4.                Prior to the commencement of the site works the applicant shall submit a construction management plan setting out details of any demolition works, removal of materials from site, parking for all contractors, sub-contractors, visitors and delivery vehicles and storage of materials to be approved in writing by the Local Planning Authority and those measures approved shall be maintained available for use at all times during the period of site works.

 

5.                Three Months prior to full use of the permitted development, a detailed Travel Plan for the site, based upon the Hertfordshire County Council document “Hertfordshire Travel Plan Guidance” and applicant’s framework Travel Plan, shall be submitted and approved in writing by the local planning authority. The approved Travel Plan shall always be implemented.

 

6.                No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing by, the local planning authority. This strategy will include the following components:

 

1. A site investigation scheme, based on (the submitted report: Phase 1 Contamination Assessment (MLM, reference: 777853-MLM-ZZ-XX-RP-J-0001, 08/07/2019) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off-site.

2. The results of the site investigation and the detailed risk assessment referred to in (1) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

3. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (2) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.

 

Any changes to these components require the written consent of the local planning authority. The scheme shall be implemented as approved.

 

7.                Prior to any part of the permitted development being brought into use, a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to, and approved in writing, by the local planning authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met.

 

8.                The development hereby permitted shall not commence until a monitoring and maintenance plan in respect of contamination, including a timetable of monitoring and submission of reports to the local planning authority, has been submitted to, and approved in writing by, the local planning authority. Reports as specified in the approved plan, including details of any necessary contingency action arising from the monitoring, shall be submitted to, and approved in writing by, the local planning authority.

To prevent deterioration and promote recovery of water quality within the Mid Chilterns WFD groundwater body.

 

9.                If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy detailing how this contamination will be dealt with has been submitted to, and approved in writing by, the local planning authority. The remediation strategy shall be implemented as approved.

 

10.               No drainage systems for the infiltration of surface water to the ground are permitted other than with the written consent of the local planning authority. Any proposals for such systems must be supported by an assessment of the risks to controlled waters. The development shall be carried out in accordance with the approved details.

 

11.              Piling, deep foundations or other intrusive groundworks (investigation boreholes/tunnel shafts/ground source heating and cooling systems) using penetrative methods shall not be carried out other than with the written consent of the local planning authority. The development shall be carried out in accordance with the approved details.

 

12.              A scheme for managing any borehole installed for the investigation of soils, groundwater or geotechnical purposes shall be submitted to and approved in writing by the local planning authority. The scheme shall provide details of how redundant boreholes are to be decommissioned and how any boreholes that need to be retained, post-development, for monitoring purposes will be secured, protected and inspected. The scheme as approved shall be implemented prior to the occupation of any part of the permitted development.

 

13.              Prior to the commencement of development approved by this planning permission (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), the following components of a scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved, in writing, by the local planning authority:

 

i)  A site investigation scheme, based on the Phase 1 Contamination Assessment prepared by MLM Consulting Engineers Limited (Report ref. 777853-MLM-ZZ-XX-RP-J-0001), to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site. This should include an assessment of the potential risks to: human health, property (existing or proposed) including buildings, crops, pests, woodland and service lines and pipes, adjoining land, ground waters and surface waters, ecological systems, archaeological sites and ancient monuments.

 

ii) The site investigation results and the detailed risk assessment (ii) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

 

iii) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in (ii) are complete and identifying any requirements for longer term monitoring of pollutant linkages, maintenance and arrangements for contingency action. Any changes to these components require the express consent of the local planning authority. The scheme shall be implemented as approved.

 

14.              Following completion of measures identified in the approved remediation scheme and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. The above must be undertaken in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’.

 

15.              In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of condition 13, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of condition 13, which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with condition 1.

 

16.              Noise emitted from operations within the site, measured as a Rating Level in accordance with BS4142 'Method for rating industrial noise affecting mixed residential and industrial areas' at the boundaries of the nearby residential premises, shall not exceed the background LA90 noise level that would otherwise prevail in the absence of noise from the site by more than 5dB(A).

 

17.              Prior to occupation of the new development, secure and weatherproof cycle storage shall be installed in the site in accordance with approved drawing 18019-TP-005.

 

18.              No part of the development shall be occupied until a detailed soft landscaping scheme for the site, including details of an appropriate irrigation systems, and a landscape management and maintenance plan, has been submitted to and approved in writing by the Local Planning Authority. The detailed scheme shall be based upon the Landscape Proposals of the approved drawings. The approved soft landscaping scheme shall be carried out not later than the first available planting and seeding season after completion of development. Any trees or plants whether new or existing which within a period of five years die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, or in accordance with details approved by the Local Planning Authority.

                  

Informatives

IN907 Consideration of proposal in a positive and proactive manner

IN910 Building Regulations

IN912 Hours of Construction

 