17/00654/FULM Land to rear of Ye Corner

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decisions:

The committee received the report of the Head of Development Management, including the relevant planning history of the site and details of the responses to the application. 

 

The Principal Planning Officer (SH) introduced the report.  He explained that the application proposed the demolition of existing buildings and redevelopment of the site to create 15 residential units with associated works.  The site was an irregular shaped parcel of land.  It was a challenging site to bring forward for development.  However, careful design had innovatively responded to the site.  The car free proposal was suitable due to the sustainable location. 

 

The Chair invited Mr Alun Evans, the agent, to speak for the application.   Mr Evans stated that the site was unique as it was almost invisible from the highway.  The existing buildings had reached the end of their life and there was no economic benefit in their continued use.  The character of the area was becoming more established as residential.  The proposal had been submitted in early June and had been reviewed in detail by planning officers.  The scheme was car free which was of material benefit to highway safety.  The scheme was designed to account for considerable level changes across the site and minimise impact on the locally listed buildings.  With regards to affordable housing, the scheme had been reviewed by an independent advisor who had concluded that due to the build costs in the scheme it was unviable to provide any financial contribution at this stage.  The developer was taking on a risk to bring forward the scheme and it would take 18 months to construct the buildings. 

 

The Chair thanked the speaker and invited comments from the committee.

 

Committee members considered that it was an attractive modern scheme, however, the extensive use of unprotected timber had not weathered well in other developments in the town due to the level of pollution.  The developer was encouraged to steer away from using timber and replace it with something that would weather well.

 

With regards to being a car free development the committee commented that although the development was close to Bushey station it was often difficult to get onto the crowded trains and there were already parking problems in Oxhey Village.  There was also disappointment at the lack of affordable housing as there was a need for this in Watford; members expressed a wish to view the viability report.

 

The Chair moved the officer’s recommendation.

 

RESOLVED –

 

that, pursuant to a planning obligation under s.106 of the Town and Country Planning Act 1990 having been completed to secure the following Heads of Terms, planning permission be granted subject to the conditions listed below:

 

Section 106 Heads of Terms

 

i)          To secure a review mechanism of the viability of the scheme for a contribution up to a maximum total contribution of £600,916 towards the provision of affordable housing in the Borough of Watford, subject to the review demonstrating the improved viability of the development.

 

Conditions

 

1.         The development to which this permission relates shall be begun within a period of three years commencing on the date of this permission.

           

2.         The development hereby permitted shall be carried out in accordance with the following approved drawings: 16668-Topo Rev A – amended plan received 26.07.17; 16668-MBS; 000 Rev P3 – amended plan received 12.10.17; 102 Rev P6 – amended plan received 17.10.17; 105 Rev P6 – amended plan received 17.10.17; 106 Rev P3 – amended plan received 26.07.17; 107 Rev P3 – amended plan received 17.10.17; 108 Rev P3 – amended plan received 17.10.17; 110 Rev P3 – amended plan received 12.10.17; 111 Rev P3 – amended plan received 17.10.17; 112 Rev P4 – amended plan received 12.10.17; 113 Rev S1; 200 Rev P4 – amended plan received 17.10.17; 201 Rev P2 – amended plan received 17.10.17; 300 Rev P3 – amended plan received 12.10.17; 301 Rev P3 – amended plan received 26.07.17; 302 Rev P3 – amended plan received 26.07.17; 303 Rev P2 – amended plan received 26.07.17; 600 Rev P2 – amended plan received 24.10.17; 601 Rev P2 – amended plan received 24.10.17; 1237-001 Rev A – amended plan received 04.08.17; 1237-002 Rev A – amended plan received 04.08.17; 1237-003; 1237-004.

           

3.         Notwithstanding the information already submitted, no construction works above damp proof course level shall commence until details of the materials to be used for all the external finishes of the buildings, including all walls, roofs, doors, windows, balconies, rainwater and foul drainage goods (including samples where considered necessary by the Local Planning Authority) and details of the reveal treatment to be applied around windows and doors have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the approved details.

 

4.         No dwelling shall be occupied until a scheme detailing the external lighting to be installed within the site (including free standing light fixtures and any external lighting attached to buildings) has been submitted to and approved in writing by the Local Planning Authority. All external lighting shall be installed prior to the first occupation of the development in accordance with the specifications and locations set out in the scheme, and shall be maintained thereafter in accordance with the approved scheme. Under no circumstances should any other external lighting be installed without the prior written approval of the Local Planning Authority.

 

5.         The development permitted by this planning permission shall be carried out in accordance with the approved Surface Water Drainage Strategy prepared by Ambiental Technical Solutions – Reference 3136 SWDS, Version Draft v4.0 (dated April 2017) and the following mitigation measures detailed within the drainage strategy:

 

i)          Providing attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event;

 

ii)         Implementing appropriate drainage strategy based on attenuation and discharge into Thames surface water sewer including SuDS features as indicated on drawing No. Lower Level, Revision 2 – Preliminary Surface Water Drainage Strategy Layout, dated 05/07/2017 and drawing No. Upper Level, Revision 2 – Preliminary Surface Water Drainage Layout, dated 05/07/2017;

 

iii)        Limiting surface water discharge off the site at a maximum allowable rate of 5.0 l/s/ha for the 1 in 100 year plus 40% for climate change event;

 

iv)        Clarification and indication in the drawing where exactly the filter drain connects with the existing infrastructure;

 

v)         Incorporation of the upper parking site in the system and provision of updated calculation considering this area;

 

vi)        Final detailed scheme with updated calculation including all site area.

 

The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.

 

6.         No development shall take place until the final design of the drainage scheme for the site, based on the approved Surface Water Drainage Strategy, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed.

 

The scheme shall also include:

 

i)          Provision of a fully detailed drainage plan showing pipe diameters, pipe runs, outlet points and location of SuDS features and supporting calculations;

 

ii)         Detailed engineered drawings of the proposed SuDS features including their, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling;

 

iii)        Final detailed management plan to include arrangements for adoption and any other arrangements to secure the operation of the scheme throughout its lifetime.

 

7.         Notwithstanding the information already submitted, no dwelling shall be occupied until details of the siting, type, size and finish of the refuse, recycling and cycle storage enclosures have been submitted to and approved in writing by the Local Planning Authority. No dwelling shall be occupied until the approved refuse, recycling and cycle storage enclosures have been constructed and made available for use. These facilities shall be retained as approved at all times thereafter.

 

8.         No dwelling shall be occupied until a detailed soft landscaping scheme for all the land within the site has been submitted to and approved in writing by the Local Planning Authority. This shall include details of new tree and shrub planting including their location, species, size (container size where applicable) and planting density. The approved landscaping scheme shall be carried out not later than the first available planting and seeding season after completion of development. Any trees or plants whether new or existing which within a period of five years die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, or in accordance with details approved by the Local Planning Authority.

 

9.         No dwelling shall be occupied until a detailed hard landscaping scheme for all the land within the site has been submitted to and approved in writing by the Local Planning Authority, and the works have been carried out in accordance with the approved details.

 

10.       No hard surfacing, other than that approved under Condition 9, shall be laid/installed within the site.

 

11.       No dwelling shall be occupied until the proposed private amenity areas, communal amenity space and soft landscaped areas have been laid out as shown on the approved drawings. These areas shall be retained as such at all times thereafter and shall not be used for car parking, manoeuvring or for any other purpose.

 

12.       Notwithstanding the information already submitted, no dwelling shall be occupied until details of the siting, height, type, materials and finish of all fencing, walls, gates or other means of enclosure around the boundaries of the site and within the site have been submitted to and approved in writing by the Local Planning Authority. All fencing, walls, gates or other means of enclosure shall be provided in accordance with the approved details prior to the first occupation of any part of the development and shall be maintained as such at all times thereafter. Notwithstanding the provisions of Class A of Part 2, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) no gates, walls or means of enclosure, other than those approved under this condition, shall be erected or installed on the site without the prior written approval of the Local Planning Authority.

 

13.       No dwelling shall be occupied until the on-site loading/unloading bays and manoeuvring area have been laid out and constructed in accordance with the approved drawings (and those details approved under conditions 5, 6 and 9) and made available for use. These facilities shall be retained as approved at all times.

 

14.       Notwithstanding the information already submitted, no construction of the approved buildings shall commence until detailed plans showing the existing and new or altered ground levels within the site and the floor levels of all the proposed buildings have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the details approved under this condition.

 

15.       The proposed first floor window in the northeast-facing elevation of the westernmost building (serving the stairwell – as detailed on drawing number 112 Rev P4 – amended plan received 12.10.17) shall be permanently fixed closed below 1.7m internal floor level and shall be fitted with obscured glass at all times unless otherwise agreed in writing by the Local Planning Authority.

 

16.       No parts of the flat roofs of the development shall be used as terraces, balconies or other open amenity spaces.

 

17.       Details of a ‘no-dig’ method of construction for the proposed bin store and other works within the root protection zone of the group of trees referred to as Group “G1” within the submitted Arboricultural Statement, prepared by RJ Tree Services Ltd (Ref. ARBORSURVEY01_Ye Corner dated 06.02.17), and as detailed on the accompanying Arboricultural Survey & Constraints Plan 01, shall be submitted to and approved in writing by the Local Planning Authority before any excavations are carried out in this root protection zone. The development shall only be carried out in accordance with the details approved under this condition.

 

18.       No works associated with the development shall be carried out to existing trees within and/or surrounding the site until a detailed schedule of such works has been submitted to and approved in writing by the Local Planning Authority. The tree works shall only be carried out in accordance with the approved details.

 

19.       No dwelling shall be occupied until details of a communal terrestrial television aerial(s) and satellite dish(es) have been submitted to and approved in writing by the Local Planning Authority. No aerials or satellite dishes, other than those approved by this condition, shall be installed within the site.

 

20.       No dwelling shall be occupied until a detailed scheme showing the provision of fire hydrants serving the development (as incorporated into the provision of the mains water services for the development whether by means of existing water services or new mains or extension to or diversion of existing services or apparatus) has been submitted to and approved in writing by the Local Planning Authority. The approved fire hydrant provision shall be installed and made available for use prior to the first occupation of any dwelling forming part of the development and shall be maintained as such thereafter.

 

21.       No construction works above damp proof course level shall commence until a noise mitigation scheme for each of the residential dwellings, based upon the recommendations of the Noise Assessment prepared by MoirHands (Report No. 3249/25/17) dated 24th March 2017, has been submitted to and approved by the Local Planning Authority. The scheme shall include the details and specifications of the sound reduction performance of all glazed and non-glazed elements of the building facades and the performance of acoustic trickle vents for all bedroom windows. An updated noise assessment shall be submitted to demonstrate that the proposed measures achieve the required internal noise levels. No dwelling shall be occupied until the approved mitigation measures have been installed in full, unless otherwise agreed in writing by the Local Planning Authority.

 

22.       No construction works above damp proof course level shall commence until the specification of a mechanical air supply/extract system for each of the residential dwellings has been submitted to and approved in writing by the Local Planning Authority. The system must be capable of providing background and rapid ventilation for cooling with the windows of the respective dwelling remaining closed. The system must not compromise the sound insulation of the façades. Details of the siting of any air intake; extraction units; generators and other mechanical equipment serving this system that are likely to give rise to noise should be submitted, along with details of noise attenuation measures to be incorporated to ensure these units do not give rise to a noise nuisance. Noise from the external plant associated with this system, when combined with any building services plant, must not exceed limit of 39dB(A) during the daytime and 27dB(a) night time, one metre from the nearest residential façades. In addition, when in operation, the sound pressure level within each flat shall not exceed the internal noise levels contained in BS8233:2014 1 metre from any associated inlet or outlet. No dwelling shall be occupied until the approved ventilation system has been installed in full, unless otherwise agreed in writing by the Local Planning Authority.

 

23.       No construction works above damp proof course level shall commence until a specification for the building services plant, to operate in combination to a noise emission limit of 39dB(A) during the daytime and 27dB(a) night time, one metre from the nearest residential façades, has been submitted to and approved in writing by the Local Planning Authority.  Any building services plant must not compromise the sound insulation of the façades. The applicant shall submit details of the building services plant, up to date plans and an updated Noise Assessment demonstrating that these noise emissions limits are met by the proposed plant.

 

24.       Notwithstanding the information already submitted, no development shall commence until a remediation strategy to deal with the risks associated with contamination of the site has been submitted to and approved in writing by the Local Planning Authority. This strategy shall include the following components:

 

i)          A preliminary risk assessment which has identified:

-           all previous uses;

-           potential contaminants associated with those uses;

-           a conceptual model of the site indicating sources, pathways and receptors; and

-           potentially unacceptable risks arising from contamination at the site.

 

ii)         A site investigation scheme, based on (i) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.

 

iii)        The results of the site investigation and the detailed risk assessment referred to in (ii) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

 

iv)        A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (iii) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.

 

No changes to these components shall be undertaken without the written approval of the Local Planning Authority. All works shall be carried out in accordance with the approved details.

 

25.       No construction works shall commence until a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation has been submitted to, and approved in writing, by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met.

 

26.       No development shall take place until a long-term monitoring and maintenance plan in respect of contamination, including a timetable of monitoring and submission of reports to the Local Planning Authority, has been submitted to, and approved in writing by, the Local Planning Authority. Reports as specified in the approved plan, including details of any necessary contingency action arising from the monitoring, shall be submitted to, and approved in writing by, the Local Planning Authority.

 

27.       If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until a remediation strategy detailing how this contamination will be dealt with has been submitted to and approved in writing by the Local Planning Authority. The remediation strategy shall be implemented as approved.

 

28.       No infiltration of surface water drainage into the ground is permitted other than with the prior written consent of the Local Planning Authority. The development shall be carried out only in accordance with the approved details.

 

29.       No piling, deep foundations, investigation boreholes or other deep intrusive groundworks using penetrative methods shall be carried out until a method statement (detailing the depth and type of piling, boreholes, foundations or other groundworks to be undertaken and the methodology by which such works will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, measures to prevent harm to groundwater resources and the programme for the works) has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the approved details.

 

30.       Prior to any part of the development hereby approved being brought into use, a scheme for managing any borehole installed for the investigation of soils, groundwater or geotechnical purposes shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall provide details of how redundant boreholes are to be decommissioned and how any boreholes that need to be retained, post-development, for monitoring purposes will be secured, protected and inspected. The development shall be carried out only in accordance with the approved details.

 

            Informatives:

 

1.         In dealing with this application, Watford Borough Council has considered the proposal in a positive and proactive manner having regard to the policies of the development plan as well as paragraphs 186 and 187 of the National Planning Policy Framework and other material considerations, and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2015. The Council entered into pre-application discussions with the applicant and requested amendments during the consideration of the application.

 

2.         You are advised of the need to comply with the provisions of The Control of Pollution Act 1974, The Health & Safety at Work Act 1974, The Clean Air Act 1993 and The Environmental Protection Act 1990.

 

In order to minimise impact of noise, any works associated with the development which are audible at the site boundary should be restricted to the following hours:

 

·         Monday to Friday 8am to 6pm

·         Saturdays 8am to 1pm

·         Noisy work is prohibited on Sundays and bank holidays

 

Instructions should be given to ensure that vehicles and plant entering and leaving the site comply with the stated hours of work.

 

Further details for both the applicant and those potentially affected by construction noise can be found on the Council’s website at:

 

https://www.watford.gov.uk/info/20010/your_environment/188/neighbour_complaints_%E2%80%93_construction_noise.

 

3.         All new developments granted planning permission and to be constructed require naming or numbering under the Public Health Act 1925. You must contact Watford Borough Council Street Naming and Numbering department as early as possible prior to commencement on streetnamenumber@watford.gov.uk or 01923 278458. A numbering notification will be issued by the council, following which Royal Mail will assign a postcode which will make up the official address. It is also the responsibility of the developer to inform Street Naming and Numbering when properties are ready for occupancy.

 

4.         The applicant is advised that the storage of materials associated with the construction of this development should be provided within the site on land which is not public highway, and the use of such areas must not interfere with the public highway. If this is not possible, authorisation should be sought from the Highway Authority before construction works commence. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.

 

5.         It is an offence under section 137 of the Highways Act 1980 for any person, without lawful authority or excuse, in any way to wilfully obstruct the free passage along a highway or public right of way. If this development is likely to result in the public highway or public right of way network becoming routinely blocked (fully or partly) the applicant must contact the Highway Authority to obtain their permission and requirements before construction works commence. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.

 

6.         It is an offence under section 148 of the Highways Act 1980 to deposit mud or other debris on the public highway, and section 149 of the same Act gives the Highway Authority powers to remove such material at the expense of the party responsible. Therefore, best practical means shall be taken at all times to ensure that all vehicles leaving the site during construction of the development are in a condition such as not to emit dust or deposit mud, slurry or other debris on the highway. Further information is available via the website http://www.hertsdirect.org/services/transtreets/highways/ or by telephoning 0300 1234047.

 

7.         You are advised that appropriate arrangement should be made within the site to provide for:

 

a.)        Servicing and Delivery associated with the construction

b.)        Parking for workers and contractors associated with the construction

c.)        Wheel washing to prevent the spread of debris onto the public highway.

 

Failure to make such provisions may be contrary to the Highways Act and/or require a separate licence from the Local Highway Authority.

 

8.         With regard to water supply, this comes within the area covered by the Affinity Water Company. For your information the address to write to is - Affinity Water Company The Hub, Tamblin Way, Hatfield, Herts, AL10 9EZ - Tel - 0845 782 3333.

 

9.         With regard to surface water drainage it is the responsibility of a developer to make proper provision for drainage to ground, water courses or a suitable sewer. In respect of surface water it is recommended that the applicant should ensure that storm flows are attenuated or regulated into the receiving public network through on or off site storage. When it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Connections are not permitted for the removal of groundwater. Where the developer proposes to discharge to a public sewer, prior approval from Thames Water Developer Services will be required. The contact number is 0800 009 3921.

 

10.       There are public sewers crossing or close to the area in which the development is proposed. In order to protect public sewers and to ensure that Thames Water can gain access to those sewers for future repair and maintenance, approval should be sought from Thames Water where the erection of a building or an extension to a building or underpinning work would be over the line of, or would come within 3 metres of, a public sewer. Thames Water will usually refuse such approval in respect of the construction of new buildings, but approval may be granted for extension to existing buildings. The applicant is advised to visit thameswater.co.uk/buildover for further details.

 

11.       This development may be considered a chargeable development for the purposes of the Community Infrastructure Regulations 2010 (as amended). The charge is non-negotiable and is calculated at the time planning permission is granted. The charge is based on the net increase of gross internal floor area of the proposed development.

 

A person or party must assume liability to pay the levy using the assumption of liability form 1 which should be sent to the CIL Officer, Regeneration and Development, Watford Borough Council, Town Hall, Watford, WD17 3EX or via email (semeta.bloomfield@watford.gov.uk).

 

If nobody assumes liability to pay the levy this will default to the land owner.  A Liability Notice will be issued in due course. Failure to adhere to the Regulations and commencing work without notifying the Council could forfeit any rights you have to appeal or pay in instalments and may also incur fines/surcharges.

 

12.       Information for developers and guidance documents in relation to land contamination can be found online at: https://www.watford.gov.uk/info/20011/business_and_licensing/349/contaminated_land and the contaminated land pages on gov.uk.

 

13.       This planning permission is accompanied by a legal agreement under Section 106 of the Town and Country Planning Act 1990 to secure a review mechanism of the viability of the scheme for a contribution towards the provision of affordable housing in the Borough of Watford, subject to the review demonstrating the improved viability of the development.

Publication date: 08/12/2017

Date of decision: 29/11/2017

Decided at meeting: 29/11/2017 - Development Management Committee